eShop Search
Country and language
Choose country:
Choose language:
Apply

Success stories

Trox

Cost-effective procurement and supply with our ECOSIT® system.

Detail view of a ventilation system.

C-Parts management: Ventilation specialist Trox relies on ECOSIT® RFID

Trox is headquartered in North Rhine-Westphalia, Germany. The company specializes in the movement of air. As the expert for air diffusers, ventilation systems and fire and smoke protection systems, Trox prove that distributing air can be an art – true to their company's motto "The art of handling air".

Initial situation

ECOSIT® delivery systems with manual order initiation

Böllhoff and Trox started working together in 2001. Since then, we have been supplying C-Parts to nine of the group's production centres. Overall, we supply Trox with approximately 500 different fasteners: including RIVKLE® blind rivet nuts, screws and plastic elements.

Until November 2018 the replacement process was transacted via ECOSIT® supply systems with manual order initiation. Böllhoff picks up the empty bins once a week and delivers the appropriate replenishment the following week.

Solution

A more flexible procurement process using the latest generation of ECOSIT® RFID

In December 2018, Trox transitioned the ECOSIT® supply system to modern RFID technology at its production centre in Neukirchen-Vluyn, Germany. During the pilot project, replacement time was reduced and order initiation was simplified. Today the procurement process is started by simply inserting a label into the RFID box, replenishment orders for items are possible up to 24 hours before the scheduled delivery date.

 

Employees working with an ECOSIT® RFID supply system
Employees working with an ECOSIT® RFID supply system Sample image: Employees working with an ECOSIT® RFID supply system

"Thanks to the new system and one delivery date per week, we have been able to reduce our replacement time by up to six days. This gives us more flexibility and is an important step towards automating our ordering process."

Left to right; Wilhelm Wagner (Department Head), Astrid Tschersisch (Purchaser) and Bernd Sowade (Quality Assurance) in front of the ECOSIT® system at Trox
Wilhelm Wagner Department head at the Neukirchen-Vluyn site
»

Result

Replacement time reduced by up to six days

When the ECOSIT® systems were transitioned the delivery quantities and the total number of bins were also adapted to meet Trox's current requirements. In this way, the space on the shelves can be optimally utilized. Additionally, the ECOBin container series with lateral access flaps has been implemented. These flaps make it easier for the operator to take out the required fasteners. Picking processes in Production Preparation are thus accelerated.

Customer benefits

  • Initiating an order is fast and easy
  • Higher security of supply
  • Flexibility with and reduction of delivery frequencies
ECOSIT® ECOBin container with RFID label, filled with DIN 933 hexagon head bolts
ECOSIT® ECOBin container with RFID label
Left to right; Wilhelm Wagner (Department Head), Astrid Tschersisch (Purchaser) and Bernd Sowade (Quality Assurance) in front of the ECOSIT® system at Trox
Left to right: Wilhelm Wagner (Department Head), Astrid Tschersisch (Purchaser) and Bernd Sowade (Quality Assurance) in front of the ECOSIT® system at Trox

More information